Saturday, May 22, 2010

Constructing a Ruined Building Part Five-End Game











For the final piece a hasty barricade has been added in front of the wall. Final drybrushing, grass, details on rubble and pipes have been completed. Can you find two outside drain pipes, a table & door, two under floor drain pipes and the broken pipes from the wc; how many have water leaking from them? The materials used for this project included styrofoam, white glue, balsawood, plastic straws,wall plaster, and diorama grass. The paint was acrylic and the base was 1/8 inch masonite.

No comments:

Post a Comment